Removing the Masts


A 80 tonne crane turned up today to remove our masts for the re-rigging.

They started by lifting a powerboat into the water, then we tied up alongside and our masts were removed

Masts removed

After that a 51 foot race boat tied up alongside us to have their carbon fibre rig removed for repairs, the last job of the morning was to remove a brand new 38 foot Jeneau yacht from a truck fit the keel and then put in a cradle to finalise assembly.

Some pictures of the masts on the ground


Leave a comment